Acceptance Test Procedure: |
1. Install Back Plug. Attach
poly lift line to pipe plug and place plug in line to be tested. Inflate
plug to proper inflation pressure from above ground using hand pump.
2. Insert Front Plug. Connect triple hose assembly to front plug and
insert plug into line. Connect other end of triple hose to Air-Loc®
Control Panel.
3. Conduct Test. Connect air compressor to control panel. Then inflate
front plug to proper inflation pressure. Introduce air through control
panel until test pressure is achieved. Monitor pressure for the time
designated for the test. If the pressure holds for the designated time
losing one psi or less, the line passes and is “Accepted." |
 |
|
|
|
|
Leak Location
Test Procedure: |
A leak location test needs to
be conducted if the line acceptance test fails. The leak location test
procedure is as follows:
1. String pipe using Cherne's Air-Loc Line Stringer or other method,
attaching winch cable which is then pulled back through line.
2. Attach two pipe plugs connected together with interconnect hose to
winch cable and place in pipeline. |
3. Connect 500' triple hose to
front plug.
4. Conduct pressure test on first 22' segment of sewer line and record
results.
5. Advance plugs forward 22' using the winch and conduct test, once
again recording results. Repeat procedure until entire line has been
tested.
|
 |
|
STAY OUT OF THE DANGER ZONE DURING THE TEST!!
Always block plugs when conducting air tests.
|